Demountable Office Partitions in Ireland — Draw the Second Layout
Draw one credible future layout before approving demountable office partitions. Mark the panels and doors that can move, the junctions that need adapting and the services that must change. That second drawing gives architects, contractors and clients a way to price flexibility while there is still time to design it in.
Imagine a Dublin office where the client wants one boardroom today and two project rooms in three years. The glazed modules might come apart neatly. If the only supply air grille, lighting control and usable doorway all land in one of the new rooms, the partition has moved and half the office still cannot be used.

Illustrative office interior. Photograph by Valentin Ivantsov on Pexels.
What two Dublin fit-outs tell us
At Arthur Cox’s Dublin offices, Sisk describes demountable walls on floors one to five alongside a raised access floor and a metal tile ceiling. At the National Lottery fit-out at 1 George’s Quay, Ardmac reports reusing glazed screens and doors where feasible while adapting the raised floor and upgrading services. The first account shows what was installed. The second shows existing components being used again in a new layout.
How to draw the second layout
1. Agree one change worth testing
Ask the client and facilities team for a change they can picture. Split a meeting room, combine two cellular offices or give part of a floor back to the landlord. Draw both layouts with doors, occupied furniture and circulation. Agree how each future room will be used before deciding where the wall should land.
2. Overlay the ceiling, floor and services
Run the proposed wall line through the reflected ceiling plan and the raised floor grid. Trace air supply and return, lighting controls, sprinklers, detection, power and data. Ask the acoustic consultant to look for paths around the wall, including shared ceiling and floor voids. Have the relevant specialists check the new layout for its intended privacy, fire strategy and access requirements.
3. Schedule the parts and price the move
Mark each panel, door set, track, seal and special end piece as retain, relocate, adapt or replace. Ask the installer to identify sacrificial parts, storage and handling needs, and making good at both the old and new wall lines. Record who owns the parts, who can remove them and where the as-built module schedule will be kept.
Worked example — one boardroom becomes two project rooms
In this illustrative design exercise, a 12-seat boardroom becomes two five-person project rooms. The initial estimate assumes all eight glazed bays and the existing door can be reused. Overlaying the proposed layout shows that six standard bays can relocate. Two end bays need different widths because the new wall meets a column. The existing door can serve one room and the other needs an additional door set, subject to the access and fire review.
The tender can now describe the move. Relocate six of the eight glazed bays, retain one door set, allow for two replacement end bays and one additional door set, and price the necessary service changes and making good separately. Check the furniture in the same exercise. Two five-person tables might need smaller footprints and different power locations, even when the chairs can be carried straight across.
The six-of-eight figure measures the proposed reuse of glazed bays in this scenario. A carbon estimate would also need quantities, material data, transport, replacements and a defined comparison period.
When do demountable partitions have an environmental advantage?
Buyle and colleagues compared seven wall assemblies in a Belgian life-cycle study. Their model covered 60 years, with refurbishment every 15 years. Some reversible systems with a higher initial impact achieved low life-cycle impacts under the modelled conditions, and a conventional drywall system with a timber substructure could also perform well. For an Irish tender, test an option with no layout change alongside one with a realistic relocation, using equivalent acoustic, access and fire performance. Make the assumptions visible so the client can see what drives the result.
Buyle et al., Journal of Cleaner Production, 2019. The European Commission’s Level(s) framework also distinguishes adaptability and renovation (indicator 2.3) from deconstruction, reuse and recycling (2.4).
Five questions to put on the tender drawing
Which future layout are we pricing, and can every new room work as drawn?
Which glazed bays, doors and tracks can be reused, and what will need to be ordered?
What happens above the ceiling, below the floor and at the façade or column?
How will furniture, access, speech privacy and services work in the occupied layout?
Who owns the parts and holds the as-built schedule, instructions and spare-parts list?
Bring the second layout to the same meeting as the finish samples. Ask the partition installer, services engineer and facilities lead to talk through the move together. Their answers can inform today’s drawings, tender allowances and handover information.